Chart Pro is project management software for creating and displaying projects via Work Breakdown Structure charts. It organizes project scope and facilitates cost and schedule control.
Enlarged image for ChartPro
ChartPro 0/1
  • Pros

    • Creates and displays projects using WBS charts
    • Organizes total work scope effectively
    • Provides framework for cost estimating and control
    • Guides schedule development and control
    • Supports dynamic revision and updating of WBS
  • Cons

    • No mention of collaboration features
    • Details on integration capabilities are absent
    • User interface design is not described
    • Specific performance benchmarks are not provided
    • No information on supported platforms

Used ChartPro for Windows?


Explore More


Full Specifications

GENERAL
Release
Latest update
Version
1.3
OPERATING SYSTEMS
Platform
Windows
Operating System
  • Windows 2000
  • Windows 2003
  • Windows 10
  • Windows Server
  • Windows 8
  • Windows 98
  • Windows XP
  • Windows ME
  • Windows NT
  • Windows Vista
  • Windows 7
Additional Requirements
None
POPULARITY
Total Downloads
4,258
Downloads Last Week
2

Report Software

Program available in other languages


Last Updated


Developer’s Description

Create and display projects using a Work Breakdown Structure (WBS) chart.
Chart Pro is a project management software application that is used to create and display projects using a Work Breakdown Structure (WBS) chart.A WBS in project management and systems engineering, is a tool that defines a project and groups the project's discrete work elements in a way that helps organize and define the total work scope of the project. The traditional WBS chart displays varying levels of detail starting with the highest or broadest at the top. Then, each item or element of the project is defined at subsequent levels until the appropriate level of detail is achieved. Example of a work breakdown structure of a aircraft system. A WBS element may be a product, data, a service, or any combination. WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control. Additionally the WBS is a dynamic tool and can be revised and updated as needed by the project manager.

Download.com
Your review for ChartPro