Used ARPC Maintenance Department Toolbar for Windows?


Editors’ Review

Download.com staff
This software enhances Microsoft Project by providing S-Curve analysis, Jalali calendar support, and resource weighting for better project tracking and earned value management.
Enlarged image for ARPC Maintenance Departme…
ARPC Maintenance Department Toolbar 0/3
  • Pros

    • Displays dates in the Jalali calendar.
    • Weighting based on duration, relative weight, and resource cost.
    • Supports sub-projects.
    • Allows activity additions/removals post-progress update.
    • Generates daily S-Curve charts.
  • Cons

    • Requires service packs to be installed.
    • Integrates with Microsoft Project via toolbar and Excel files.

Used ARPC Maintenance Department Toolbar for Windows?


Explore More


Full Specifications

GENERAL
Release
Latest update
Version
2.18
OPERATING SYSTEMS
Platform
Windows
Operating System
  • Windows 2000
  • Windows ME
  • Windows NT
  • Windows 2003
  • Windows XP
  • Windows 8
  • Windows 7
  • Windows 98
  • Windows 10
  • Windows Vista
  • Windows Server
Additional Requirements
Microsoft Project 2003 SP3 / Microsoft Project 2007 SP3 / Microsoft Project 2010 SP2 ( 32 / 64 bit ) / Microsoft Project 2013 SP1 ( 32 / 64 bit ) / Microsoft Excel 2003
POPULARITY
Total Downloads
14,354
Downloads Last Week
0

Report Software

Program available in other languages


Last Updated


Developer’s Description

Get S-Curve for Microsoft Project, Jalali (Shamsi - Persian Calendar) Date, and Weighting.
The software includes a toolbar and several Excel files to work with Microsoft Project. SCurve for Microsoft Project , Jalali Date , Weighting. Goals : 1. Preparation and Tracking Projects using Microsoft Project Earned Value. 2. Use of Jalali Date. Main features : 1. View dates in Jalali calendar. 2. The function of weighting based on three factors, Duration, Relative weight and Cost of resources. 3. Ability to work with Sub-projects. 4. Set physical progress by One-to-One and One-to-Many method. 5. Adding and removing activity after updating actual progress without causing any problem in the scheduling calculations. 6. Presenting Planned progress and Actual progress in specific date by applying weight factor. 7. daily S-Curve charts is available for end of a day or specific time in a day for project summary task or specific task. 8. A statistical table presents the status of major project activities. 8.Update MS Project file by Excel.SERVICE PACKS SHOULD BE INSTALLED.