Intellisys Project Desktop X specifications

What's new in version 1.26

  • Enhancements
    • Multiple constraint types for projects for better schedule control
    • Automatic constraint generation based on user actions
    • New scheduling mode - don't overload resources.
    • Immediate scheduling on certain changes
    • Early detection of dependency inconsistencies.
    • New backup and restore functionality
    • Enhanced auto saving
    • Time Tracking column shows total hours tracked
    • Option to use Time tracking information to update Actual Effort
    • New options to adjust effort when importing external projects
    • Usability improvement in the Column Definition Editor
    • Gantt chart cursor improvements.
    • Usability improvements in the User Editor
    • Selected Table cell visibility improved.
  • Bugs fixed
    • Saving a report to PDF twice causes an error
    • Selecting the Totals option causes report generation to fail
    • Report totals don't work in the presence of invalid data
    • Columns with output type Number missing totals in reports
    • Columns with negative numbers missing from reports
    • OR and NOT not working properly in Formulas.
    • In user-defined columns, rows with a null value assume previous row's value
    • Gantt chart bar does not show % complete for superprojects
    • Doubleclicking on resources column causes detail dialog to appear immediately
    • Changing the Assigned To field adds the resource instead of replacing
    • Cancelling import shows spurious success message
    • Table view not properly refreshed after Paste
    • Spurious Dependency inconsistency messages showing
    • Cancelling a create dependency operation fails
    • Only the first dependency shows in the Dependencies column
    • Dependencies not restored properly on undo
    • Text out of date in the Adjust window.
    • Newly created User does not show until app is exited
    • In some columns, invalid input causes the edited value to be nullified instead of preserving the previous value
    • Invalid input in date columns causes freeze
    • Gantt PDF save freezes at the 'Save Filename' window
    • After Indent-left, Indent-right, selection gets lost
    • All subprojects being locked should not imply that the parent is locked
    • With auto scheduling off adjusting the scheduled finish date does not work as desired
    • Automatic resource allocation adjustment allows allocations of over 100%
    • Working time of the resource ignored when scheduling overconstrained project.
    • The cut operation should not be allowed in offline mode (Enterprise)

General

  • Publisher Intellisys Inc.
  • Publisher web site http://www.webintellisys.com
  • Release date September 14, 2003
  • Date added September 13, 2003
  • Version 1.26

Category

System requirements

  • Operating systems Mac OS X 10.3, Mac OS X 10.0, Mac OS X 10.1, Mac OS X 10.2
  • Additional requirements
  • Mac OS X 10.0 or higher

Download information

  • File size 8.39MB
  • File name Not available

Popularity

  • Total Downloads 82
  • Downloads last week 4

Pricing

  • License model Purchase
  • Limitations Not available
  • Price $89.00
  • Recently Viewed Products
  • My Lists
  • My Software Updates
  • Promo
  • Log In | Join CNET