Intellisys Project Desktop X specifications
What's new in version 1.26
- Enhancements
- Multiple constraint types for projects for better schedule control
- Automatic constraint generation based on user actions
- New scheduling mode - don't overload resources.
- Immediate scheduling on certain changes
- Early detection of dependency inconsistencies.
- New backup and restore functionality
- Enhanced auto saving
- Time Tracking column shows total hours tracked
- Option to use Time tracking information to update Actual Effort
- New options to adjust effort when importing external projects
- Usability improvement in the Column Definition Editor
- Gantt chart cursor improvements.
- Usability improvements in the User Editor
- Selected Table cell visibility improved.
- Bugs fixed
- Saving a report to PDF twice causes an error
- Selecting the Totals option causes report generation to fail
- Report totals don't work in the presence of invalid data
- Columns with output type Number missing totals in reports
- Columns with negative numbers missing from reports
- OR and NOT not working properly in Formulas.
- In user-defined columns, rows with a null value assume previous row's value
- Gantt chart bar does not show % complete for superprojects
- Doubleclicking on resources column causes detail dialog to appear immediately
- Changing the Assigned To field adds the resource instead of replacing
- Cancelling import shows spurious success message
- Table view not properly refreshed after Paste
- Spurious Dependency inconsistency messages showing
- Cancelling a create dependency operation fails
- Only the first dependency shows in the Dependencies column
- Dependencies not restored properly on undo
- Text out of date in the Adjust window.
- Newly created User does not show until app is exited
- In some columns, invalid input causes the edited value to be nullified instead of preserving the previous value
- Invalid input in date columns causes freeze
- Gantt PDF save freezes at the 'Save Filename' window
- After Indent-left, Indent-right, selection gets lost
- All subprojects being locked should not imply that the parent is locked
- With auto scheduling off adjusting the scheduled finish date does not work as desired
- Automatic resource allocation adjustment allows allocations of over 100%
- Working time of the resource ignored when scheduling overconstrained project.
- The cut operation should not be allowed in offline mode (Enterprise)
General
- Publisher Intellisys Inc.
- Publisher web site http://www.webintellisys.com
- Release date September 14, 2003
- Date added September 13, 2003
- Version 1.26
Category
System requirements
- Operating systems Mac OS X 10.3, Mac OS X 10.0, Mac OS X 10.1, Mac OS X 10.2
- Additional requirements
- Mac OS X 10.0 or higher
Download information
- File size 8.39MB
- File name Not available
Popularity
- Total Downloads 82
- Downloads last week 4
Pricing
- License model Purchase
- Limitations Not available
- Price $89.00